Roofing questions, answered.

Practical guidance from experienced roofing contractors, for property owners, facilities managers and developers.

What you'll find here

  • Higher-risk buildings & Gateway 2 explained
  • Practical answers from roofing specialists
  • Guidance for owners, FM teams and developers
  • Maintenance, refurbishment and compliance
  • Clear next steps for your building

Building Safety Act 2022

Higher-risk buildings & Gateway 2

How the building safety regime in England affects roofing and building work on taller residential blocks, hospitals and care homes.

What is a higher-risk building (HRB)?

Under the Building Safety Act 2022, a higher-risk building in England is one that is at least 18 metres in height or has at least 7 storeys, and contains at least 2 residential units. For building control purposes, hospitals and care homes meeting the same height threshold are also included.

Who approves building work on a higher-risk building?

Since October 2023 the Building Safety Regulator (BSR) has been the building control authority for higher-risk buildings in England. Clients can no longer choose a local authority or private building control approver for this work.

What are the three Gateways?

Gateway 1 sits at the planning stage. Gateway 2 is the building control approval application to the BSR, which must be approved before building work starts. Gateway 3 is the completion certificate application, which must be approved before a new higher-risk building can be occupied.

Does Gateway 2 apply to roofing work on an existing HRB?

Building work on an existing higher-risk building requires a building control approval application to the BSR, and the work cannot start until it is approved. Whether a particular roofing job is 'building work' under the Building Regulations depends on its scope, so this should be confirmed for each project.

How long does the BSR take to decide a Gateway 2 application?

The statutory decision period is 12 weeks for a new higher-risk building and 8 weeks for building work to an existing higher-risk building, unless a longer period is agreed with the applicant. Programmes should allow for this before any work begins on site.

What does the BSR check at Gateway 2?

The BSR uses the application to check that the proposed work will comply with building regulations, that the client will properly manage the project, and that the people appointed to work on it are competent to do their job.

What happens if the design changes after approval?

The approved application documents become the 'agreed documents'. Any change to them is a controlled change that must be assessed under the change control plan and recorded in a change control log. Notifiable changes must be reported to the BSR before the related work starts, and major changes need BSR approval. Swapping a product for one with a different reaction-to-fire specification may be a notifiable change, even if it is higher.

Source: Building Safety Regulator guidance on GOV.UK. This is general information for England, not legal advice — always confirm requirements for your specific project.

How Axel Group can help

Roofing and building envelope work on higher-risk buildings

We deliver the roofing and survey work behind these projects. We don't make Gateway 2 applications for you — we give your design team the roof information, records and works they need.

  • Drone roof surveys with 2D maps, 3D models and interactive condition reports
  • No scaffolding or roof access needed on occupied residential blocks
  • Moisture mapping and electronic leak detection to pinpoint defects
  • Roof refurbishment, overlays and building envelope works under one contract
  • Reports you can share with the principal designer and building safety manager
  • Roof surveys and roof works on buildings with RAAC, to your structural engineer's specification
  • Constructionline Gold, CHAS Advance and ISO 9001/14001/45001 accredited
Discuss a higher-risk building project

General roofing questions

How long does a commercial flat roof last?

It depends on the system. As a guide, built-up felt systems typically last 20–30 years, single-ply membranes (PVC, TPO, EPDM) 20–30+ years, and liquid-applied systems 15–25 years, assuming they are installed by an approved contractor and maintained regularly. Manufacturer guarantees on approved installations commonly run 15–25 years.

Can my existing flat roof be overlaid, or does it need stripping?

An overlay is often possible when the existing roof deck is sound, dry and structurally able to take the extra load. A condition survey — including core samples and moisture readings — tells you whether trapped water or a failed deck means a full strip-and-replace is needed. Overlays usually cost less and cause less disruption.

What are the signs my commercial roof needs repair or replacement?

Common signs are internal leaks or damp patches, standing water (ponding) that remains well after rainfall, blistering, splits or cracked membranes, failed flashings and laps, corroded fixings on metal sheet roofs, and rising energy bills from poor insulation.

Do I need to upgrade insulation when I refurbish my roof?

In England, replacing more than 50% of a roof's covering (or 25% of the whole building envelope) is usually classed as renovation of a thermal element under Building Regulations Part L, which normally requires the insulation to be brought up to current standards where technically and economically feasible. Your contractor and building control can confirm what applies.

What should I do if my warehouse roof contains asbestos?

Don't disturb it. Asbestos cement sheet roofs are often over-clad with a new insulated composite or built-up system, which avoids removal. If removal is needed, it must be carried out by a licensed or suitably trained contractor following an asbestos survey.

How often should a commercial roof be inspected?

Industry guidance commonly recommends at least twice a year — typically spring and autumn — and after severe storms. Planned preventative maintenance (gutter clearance, checking outlets, flashings and laps) helps prevent leaks, and regular maintenance is often a condition of keeping a manufacturer's guarantee valid.

What accreditations should a roofing contractor have?

Look for NFRC membership, health and safety schemes such as CHAS, SafeContractor or Constructionline, TrustMark for domestic work, ISO 9001/14001/45001 certification, and approval from the manufacturer whose system is being installed — which is usually required for the guarantee. Check insurance levels too.

Why does manufacturer approval matter?

Manufacturers such as Bauder, Langley, Sika, Kingspan and Alumasc only issue their full system guarantees when the roof is installed by a trained, approved contractor and inspected. Using an unapproved installer can leave you without a guarantee.

Can roofing work be done while my building stays in use?

Usually, yes. Work can be phased in sections, scheduled around operating hours, and protected with temporary waterproofing, edge protection and segregated access so that warehouses, offices, schools and shops keep running.

Is a single-ply membrane or a felt roof better?

Neither is better in every case. Single-ply is lightweight and quick to install — well suited to large industrial roofs. Built-up felt is very robust and tolerant of foot traffic. Liquid systems suit complex details and refurbishing over existing roofs. A survey determines the best fit for the building and budget.

Disclaimer

The information on this page is provided for general guidance only and does not constitute legal, technical, structural, regulatory or professional advice. While we aim to keep it accurate and up to date, Axel Group Ltd makes no representations or warranties of any kind, express or implied, about its completeness, accuracy, reliability or suitability for any purpose. Any reliance you place on this information is strictly at your own risk. To the fullest extent permitted by law, Axel Group Ltd, its directors, employees and agents accept no liability whatsoever for any loss, damage, cost or expense of any kind, whether direct, indirect or consequential, arising from the use of, or reliance on, this information. You should always obtain independent professional advice specific to your building and project before taking any action. Nothing in this disclaimer limits or excludes any liability that cannot be limited or excluded under the law of England and Wales.