Roofing · Place of worship · Leicester
True Jesus Church
Client: True Jesus Church (direct appointment)
Project overview
Appointed directly by True Jesus Church as Principal Contractor, Axel Group carried out a full strip and re-roof of approximately 750 m² in Leicester. The existing asphalt roof had suffered blistering and major leaks to the top floor over a number of years. A Langley felt system with flat insulation was installed while the building remained operational throughout.


Key challenges
- Long-standing leaks: Blistering asphalt and significant water ingress affected the top floor over several years.
- Live building: The church remained operational throughout the works.
- Tight logistics: Car park space and the compound were constrained, with street access restricting delivery sizes.
- Unexpected structural issue: Movement in brick walls was identified during stripping; a structural engineer was involved and advised rebuilding.
Our approach
- Direct client liaison: Ongoing communication with the church supported delivery while the building stayed operational.
- Roof replacement: The existing roof was stripped to deck and replaced with flat insulation and a Langley felt system.
- Engineer-led remedial work: Affected brick walls were rebuilt following the structural engineer's advice.
- Safe access: Scaffolding was used to manage site access and safety.
Outcomes
- Works fully completed with a 30-year guarantee issued.
- The building remained operational throughout the project.